Rakesh can do a piece of work in 20 days. How much work can he do in 4 days?
The given details are,
Time taken by Rakesh to do a piece of work is 20 days
Work done by Rakesh in 1 day = 1/20
Work done by Rakesh in 4 days = 4 × 1/20
= 1/5
∴ 1/5th work can be done by Rakesh in 4days.